•  
  •  

Aqua/Terra Modis possible NRT generation delay

13 April 2011

Due to an update of the Meos Polar System at Matera Station, there might be possible a delay in generating NRT L1 Aqua/Terra Modis products in the following days: 12-13/04.

The delay will affect only the products which will be collected at Matera Station. The NRT generation will be postponed at the end of each day.