•  
  •  

Envisat NRT processing problems - operations resumed

09 November 2010

The issue affecting the production of the Envisat RA-2 and MERIS Near Real Time (NRT) data since 4 November 2010 has now been solved news from 05 Nov 2010.

The nominal Near Real Time production and dissemination of RA-2 and MERIS Full (FR) / Reduced Resolution (RR) level 1 and level 2 data has resumed at all centres since today, 9 November 2010. The backlog processing is ongoing and will be completed as soon as possible.