05 November 2010
Technical issues at the PDHS-K facility are currently resulting in processing failures for Level 1 and Level 2 MERIS and RA2 products.
Work is ongoing to solve the problem, however, resolution is not expected until after the weekend (06/11 - 07/11).
Updates will be posted as soon as they are available