PDHS-K (Kiruna) - Processing delay
05 October 2010
Due to processing failures at the PDHS-K facility, the production and dissemination of the Level 1 and Level 2 products have been affected.
Work is ongoing to resolve the issues and operations shall resume as soon as possible.