•  
  •  

PDHS-K (Kiruna) - Processing delay

05 October 2010

Due to processing failures at the PDHS-K facility, the production and dissemination of the Level 1 and Level 2 products have been affected.

Work is ongoing to resolve the issues and operations shall resume as soon as possible.