23 August 2010
A system problem causing delay in the Envisat Near Real Time (NRT) level 1 and 2 production at the PDHS-K (Kiruna) facility on 22 August 2010 has been solved and nominal operations has been resumed.
Work is ongoing to complete the backlog as soon as possible.