23 June 2010 - The new MIPAS/ENVISAT operational processor (IPF) Version 5.05 was successfully activated in D-PAC processing site on 21 June 2010 for the off-line consolidated data processing. Together with the successful switch in the near real-time (NRT) centres performed during 10 June 2010, the operational ESA MIPAS Level 2 forward processing both for NRT and consolidated products is now fully restored.
The switch orbit for the off-line products is orbit number 43333 from 14 June 2010.
MIPAS Level 1 and Level 2 off-line products are carefully checked since the switch in order to verify the processing performances and quality.
Please refer to the news from the 15 June 2010 about MIPAS IPF 5.05 NRT switch for further details.
MIPAS Level 1 and Level 2 consolidated products are currently disseminated via the D-PAC ftp accounts.
Please contact the ESA EO Helpdesk to get access to the MIPAS data.